Floor Joist To Concrete


Floor Joist To Concrete. Spans of 40 feet are routine, and spans up to 65 feet are possible with deep joists and a thicker concrete cover. When a joist is installed above a foundation wall, a sill plate made of solid lumber is bolted to the concrete, and the joist is nailed to the top of the sill. I love the cedar shingles as its tapered nice and long and wide.

Floor Joist To Concrete Pictures
West Van - steel beams « home building in Vancouver

The hangers drop the floor joists below the top of the concrete foundation. Filler pieces placed between the floor joists and along the end walls retain the fluid concrete between the joists. In essence, the steel joist takes the tensile load and the concrete absorbs the compressive load, with the floor acting like a flange to prevent twisting.

Gallery of Floor Joist To Concrete

When a joist is installed above a foundation wall, a sill plate made of solid lumber is bolted to the concrete, and the joist is nailed to the top of the sill. Crews cut the speedfloor joists to length and bolt heavy hangers to the ends. The crew sets the joists on the walls with a spacing of slightly over 4 feet on center. With some structures, floor joists are required to be 12 or 24 inches apart on center.